Project Profile - Noramco Building One Reroof



Although we have been Noramco's roofing company of choice for the past decade and have roofed many buildings at their site, none was more challenging than the recently completed Building One reroof.

Because of the manufacture of a highly sensitive drug in the building, we could only have access to the roof during a four week time slot. To complicate matters, a complete mechanical shut-down and renovation was being done at the same time, coordinated by Century Contractors of Matthews, NC. Whatever roofing wasn't complete in four weeks would not be able to be finished.

The entire roofing system, which actually consisted of 2 old roofs, was to be removed to the deck, rusted areas of the metal deck replaced, and a new 30 year NDL 3-ply Soprema modified bitumen membrane system would then be installed. With a great deal of very careful planning and coordination with the general, we were able to complete the remove and replacement of the 19,546 square foot area in just under the required time. Another very happy contractor and customer.